ModuSofa · Oak / Corduroy
Nominal cartons per item: 2
- b1 · 115 × 50 × 20 cm · 24 kg
- b2 · 100 × 70 × 35 cm · 18 kg
Choose living and bedroom furniture together. Check the selected product and its packages before requesting an itemized quote.
Start with the selected furniture list and review the published source for each item. These sofa and Queen-frame references cover only their stated configurations, not every kit or the current URL selection. Missing package or weight information remains pending. A static carton comparison does not approve a continuous delivery route, handling method or assembly plan.
Nominal cartons per item: 2
Nominal cartons per item: 2
Synthetic example · 29 October 2026: two fictional renters review one ModuSofa and one SnapBed Queen frame first, with a dining surface and two seats left as a separate later requirement. The living room (300 × 380 cm) and bedroom (280 × 360 cm) are illustrations, not measured rooms or Kit inputs.
This is not fit approval, an orderable BOM or a quote. Exact contents, mattress/support requirements, availability, delivery and itemized prices remain unconfirmed. Check the visible selection before using the existing editable enquiry. Use the four-row worksheet in a spreadsheet; the Kit does not import CSV files.
Measure the room, then compare the product and package dimensions with your doorway, hallway turns, stairs, and elevator. The largest package needs to fit the full route into your home. Check assembled and package dimensions for each selected product separately. Make a one-bedroom room-layout record
Start with the furniture configuration that you are actually reviewing, including the selected bed size and separately chosen items. Keep its current product links or selection reference with the room sketch. A saved configuration can help identify a choice; it does not verify that the choice fits your room.
For each everyday route, write down its start and destination: entering a room, reaching the bed, moving between seating and dining areas, or accessing a work surface. Mark the door’s opening path, fixed obstructions and furniture parts that need movement, such as a drawer. Use measurements from your room and the published assembled dimensions for the exact selected product. Keep delivery-carton measurements in the separate access record.
Record one unresolved conflict per row. Identify the activity, the relevant furniture item or moving part, the measurement source and what still needs confirmation. Try a different proposed position or omit an optional item on the sketch, then review the same activity again. Do not treat a universal gap, an attractive render or a successful carton delivery as proof that everyday use will work.
If a bed-size option does not have a matching frame specification, leave that footprint unconfirmed rather than substituting the Queen table for King. A room route also does not establish structural loading, accessible-design compliance or emergency-egress approval. Where those questions apply, request advice from the appropriate building or qualified professional.
Keep confirmed observations separate from proposals. This blank review record contains no measured customer example and is not a room-design service or an approval to install furniture.
Copy a blank activity-route record header (CSV); keep your room sketch and record privately. This page does not collect or save them.
selection_reference,room_zone,activity_start_and_destination,furniture_and_moving_part,assembled_dimension_source,room_measurement_basis,proposed_position,observed_or_unresolved_conflict,alternative_to_review,confirmation_status
Choose a room, then review the selected product’s available options and specifications. Record the exact selection when asking the team to review a configuration. Review active selections and separately selected options; confirm actual kit contents. Review kit selections and optional items If product details are unavailable, contact the team before ordering.
Ask for an itemized confirmation for the current selection and keep inclusion separate from whether an item is required. Use included, required extra or optional only when the matching product or quotation source supports that classification. Keep quantities, options and any separate charge beside the relevant line. If the source is missing or contradictory, leave the classification unknown rather than assuming it is optional. A pictured item, a separate package or a selection control does not establish inclusion, availability or a confirmed total.
Unknown or pending is an evidence status, not a fourth confirmed inclusion type. Keep the selection reference, item, configuration, quantity, classification source/date, requirement basis, included-in-subtotal note and confirmation status together. Missing entries remain unknown.
Compare the same intended room activities and final selection in both proposals. Record which spaces remain usable at each stage, which required items or checks are unresolved, and what each plan assumes about availability, delivery and assembly. Ask for comparable itemized terms rather than assuming that buying together saves money or that a later stage will have matching finishes. Choose only after the dependencies and conditions are clear; this matrix does not approve either layout, confirm a move-in date or recommend a financing arrangement.
| Classification | Evidence needed | What it does not establish |
|---|---|---|
| included | Written inclusion for the exact configuration and quantity, with source/date and any included-in-subtotal note | Availability, a delivery booking or every associated service being free |
| required extra | Product-specific requirement confirmed separately from the exact quote's included list; unresolved price recorded separately | Permission to omit a required support, replace it or relabel it optional |
| optional | The corresponding source explicitly identifies a separately chosen option; keep it in layout/access planning if selected | Inclusion in the base configuration or current availability |
| Decision to review | All-at-once proposal | Staged proposal | Still confirm |
|---|---|---|---|
| Essential activities | List the activities the complete selection is intended to support | Record which activities and spaces remain usable before each later stage | Required items/supports and unresolved dependencies; no approval to use an incomplete frame |
| Layout and room access | Review the final footprint and furniture movements together | Recheck the temporary layout and room route at each stage | Exact configurations, source dimensions and observed obstructions, not a universal gap |
| Selection and finish | Confirm the current itemized configuration | Record which later options or finish matches remain unconfirmed | Availability and substitutions; matching supply later is unknown |
| Amounts and services | Review one proposal's confirmed, non-overlapping line items | Request the corresponding stage-specific itemization and service scope | Currency, included charges, estimates and validity; no assumed bundle discount or free repeat delivery |
| Delivery and timing | Ask what availability and delivery assumptions cover the selection | Ask how split shipments and later confirmations affect each proposed stage | Destination eligibility, delivery point and conditions; no promised arrival or move-in date |
| Assembly and packaging | Review the documented work and staging requirements for the selected items | Review those requirements for each stage without blocking the room route | Applicable manuals, people/tools and handling/protection permissions remain unknown until confirmed |
No. Assembly time describes putting the product together after it arrives. Follow the instructions for that product; assembly time is not a delivery estimate. See how the craft and logistics process works before ordering. Read how it works.
A product-price line does not include destination delivery unless the quotation explicitly says it does. Ask for a written, itemized quote for the exact configuration and destination. Compare confirmed amounts and included services, not a headline price or the letters DDP alone. This guide is a review record, not a live quote, delivery approval or payment instruction.
Record each product or configuration, its options, quantity and the date you checked the selection. Keep separately selected items separate from the core kit. Ask which items are available for that configuration; a product appearing on the website is not a confirmed delivery booking. State the destination country and the location detail needed for an initial quote. Do not post your address or floor plan publicly. If the team needs more detail, confirm the appropriate private channel. Two quotes for different quantities, finishes or destinations are not a like-for-like comparison, even if their totals look similar.
Ask for the product amount, any confirmed configuration adjustments, freight and the import charges that apply to the destination. For each line, record the currency, whether it is included in another subtotal, and whether it is confirmed or estimated. Do not add a duty or tax line again when it is already inside an import-charge subtotal. Ask the team to explain any other delivery or handling charge rather than inventing an allowance. Add only non-overlapping, confirmed amounts in one currency. An omitted charge is unknown, not zero; record zero only when the quote explicitly confirms that nothing is charged for that line.
DDP means Delivered Duty Paid, but the label alone does not show the itemization for your order. Ask which delivery location the quote covers, which freight and import charges are included, and which amounts remain estimates. Ask whether any destination-specific taxes or other charges could be payable separately and how they would be confirmed. Keep the answer with the quote rather than assuming that every possible local service is covered. If a seller describes an all-in total, ask how that total relates to the individual lines so you can distinguish included amounts from exclusions. Unclear terms stay pending until they are explained.
Confirm whether the quoted service ends at a named delivery point and whether room placement, stairs, elevator handling, assembly or packaging removal are included, excluded or still unconfirmed. None of those services follows automatically from a freight amount. Ask separately about product availability, production and transport estimates, and what event starts each estimate. Record when the quote was issued, how long it remains valid and which assumptions could change the amount or schedule. A building delivery slot or an assembly plan does not establish the arrival date. Ask the relevant team to review building-access requirements separately from the price; a price does not prove that a package will pass.
Put the same selection, quantities, destination, currency and service scope beside each other before comparing totals. If currencies differ, agree the comparison rate and date rather than presenting an unverified conversion as the payable amount. Keep a list of missing or estimated lines and ask which changes require a revised quote. Do not rank an incomplete quote as cheaper just because its freight or taxes are blank. When the itemization or destination eligibility is unresolved, the next step is a clarification request, not a purchase decision. This process does not promise a discount, a fixed price or availability in any country.
Selection and options: ____ | Quantities and separately selected items: ____ | Destination for review: ____ | Quote reference and issue date: ____ | Currency: ____ | Product amount: ____ | Freight: ____ | Duties, taxes and other import charges: ____ | Included-in-subtotal notes: ____ | Confirmed total, or pending: ____ | Included and excluded delivery services: ____ | Production and transport estimates with start events: ____ | Valid-until date and change conditions: ____ | Unknown or estimated items and who must confirm them: ____. Keep this record with the written quote so later changes can be compared against the same assumptions.
Online checkout remains closed. Use the existing contact page to ask about your configuration and destination, with the unresolved quote questions from your record. Sending an enquiry is not a confirmed price, order or delivery booking. This guide does not confirm that a message has been submitted or received. Read shipping information. See the FAQ. Request an itemized kit scope review